Frequently Asked Questions
-
The City of Midlothian has placed a bond referendum on the November ballot to seek voter approval for funding future capital projects to address continued growth. Thanks to the city’s strong financial position, it can take on this debt without increasing the tax rate. General obligation bonds allow the city to invest in long-lasting public infrastructure now and repay the cost over time, supporting improvements while maintaining financial stability.
-
Last spring, city leaders formed a Citizens Planning Group to refine and set priorities for street and park improvements, drainage study needs, and law enforcement facilities, which have been selected as the bond projects offered in this referendum.
The City of Midlothian has a long history of engaging citizens in the decision-making process. Citizens helped craft the City’s Comprehensive Plan as well as the Parks Master Plan, both of which were used to help identify needs for capital improvements. More recently, the city conducted a community satisfaction survey, which revealed resident concerns about traffic congestion and safety, as well as the need for additional recreational facilities.
-
The five-year financial projections used for this referendum indicated no tax rate increase should the bonds pass.
-
Proposition A – Street Projects - $102.3 million
Dr. Rick Davis Drive from George Hopper Road to Methodist Way
Construct Dr. Rick Davis Way to connect George Hopper Road to Methodist Way, approximately a quarter mile.
FM 1387 at Walnut Grove Road
Full intersection construction.
Hayes Road from FM 1387 to US Hwy. 287
Extend Hayes Road with two lanes, approximately three miles from FM 1387 to US Hwy. 287.
Midlothian Parkway at Main Street and FM 1387
Improve Midlothian Parkway intersection at Main Street and FM 1387.
Mockingbird Lane from Walnut Grove Road to Hayes Road
Expand Mockingbird Lane from Walnut Grove Road to Hayes Road.
Mt. Zion Road from Sudith Lane to Shady Grove Road
Expand Mt. Zion Road approximately one mile from Sudith Lane to Shady Grove Road.
Shady Grove Road from Mt. Zion Road to Plainview Road
Expand Shady Grove Road from Mt. Zion Road to Plainview Road.
Walnut Grove Road from FM 1387 to Mockingbird Lane
Expand Walnut Grove Road from FM 1387 to Mockingbird Lane approximately three-quarters of a mile.
Proposition B – Police Substation - $6.81 million
A police substation will increase the police presence in the eastern part of town, allowing Midlothian police to maintain quick response times despite increasing traffic throughout the 65-mile service area. The new facility will be located on the grounds of The Heights, domestic violence center, which will also improve service to this vulnerable population. The property for this additional location for police operations would be provided at no cost to the City of Midlothian.
Proposition C – Drainage Studies and Projects - $10 million
Stormwater drainage and flood-control studies and projects throughout Midlothian. The funding would evaluate drainage issues and areas prone to flooding and address the city’s ability to manage stormwater in order to protect streets and neighborhoods as Midlothian continues to grow.
Proposition D – Existing Park Improvements - $47.26 million
Jaycee Baseball Practice Fields Renovation
Built in the 1970s, Jaycee Park served as the primary community baseball fields until Midlothian Community Park baseball fields were opened in 2022. Now serving as tournament and practice fields, Jaycee has received periodic updates, but needs more extensive renovations for public enjoyment and safety, including:
Upgrade to synthetic turf infields to decrease number of days fields are closed due to rain
Playground & surroundings – create more user-friendly shape for the park and add new shade structure, drainage, and playground surfacing
Concrete sidewalks, bleacher pads, and replace all deteriorating concrete
Add new bleachers and shade structures
Upgrade all lighting to LED except for gold field
Build new concession stand & restrooms
Build park maintenance & baseball storage facility
Add interior park signage and wayfinding
Add an exterior park sign & landscaping
Add new exterior wayfinding park sign
Sports Complex Bottom-up Rebuild
Midlothian Sports Complex opened in the early 1990s and has been home to the Midlothian Tennis Association and Midlothian Softball Association for many years. Operated in partnership with the Midlothian Independent School District, the aging facility has experienced maximum use and has had few updates over the years. In order to maximize the available land, the current fields will be demolished and utilities relocated. This will allow two additional fields to be built along with additional parking. Improvements will include:
Increase from four to six softball fields with shaded bleachers
Improve tennis courts, pickle-ball courts and shade structure
Relocate shot put and discus
Relocate basketball and volleyball courts
Replace playground and shade pavilion
Add parking lots, drives and trails
Add detention ponds
Build new concession stand, restrooms, and storage area
Improve amenities and batting cages
Add sod, trees, irrigation and landscaping
Add lighting to all areas
Mountain Peak Neighborhood Park Refurbishment
Since Mountain Peak Park was built, few improvements have been made to the facility. To increase use and enjoyment of the park, improvements will include:
Install two backstops
Refresh existing bathroom
Clean and paint existing pavilion and add two small pavilions
Resurface basketball court and goals
Improve amenities
Add lighting
Add interior signage/wayfinding
Add park entrance sign
Enhance landscaping, trees and grading and irrigation
Improve playground, surface and shade structures
Re-work drainage ditch
Proposition E – New Parks - $26.09 million
Mockingbird Multipurpose Fields
Located on city-owned land on the corner of Mockingbird Lane and Midlothian Parkway, this facility would accommodate multipurpose fields, including soccer, football, and flag football. Facilities will include:
Lighted fields
Parking lot and drive
Restroom and concessions
Irrigation
Soil and turf
Signage/Landscaping
Sidewalks/Trails
Parks maintenance and youth league storage
Playground and shade structure
Ledgestone Park
Located on city-owned land west of Earl & Marthalu Dieterich Middle School on Ledgestone Drive, this unique, 34-acre park will feature outdoor recreational facilities open to all ages including the following:
Bicycle pump track
Mountain bike trails
Bike wash/repair area
Shaded obstacle course
Playscape
Open play area
Shared-use trail
Skate park
Bird blind/Creek access loop
Entry plaza/Restroom pavilion
Parking lots
-
The Citizens Planning Group recommended a bond package that would be funded over five years. As such, all projects would be staged and completed within seven years. Project funding also will be sequenced so that the timing of bond issuance takes advantage of market and economic conditions, preserves the City’s borrowing capacity, and manages the debt service to ensure no impact on the tax rate.
-
-